Query
SIENNA SOLAR 2
Type
Entity Briefing
Entity
SIENNA SOLAR 2
Generated
2026-10-12T01:52:28.324Z

Briefing on SIENNA SOLAR 2

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
112 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2029-03-26
Proposed COD
C14
Queue phase
Briefing/projectactive

SIENNA SOLAR 2 is a 112 MW Solar+Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2029-03-26.

Queue ID
CAISO-2097
Location
San Bernardino, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Calcite Substation 230 kV

What stands out

1

SIENNA SOLAR 2 is a 112 MW Solar+Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2029-03-26.

Market and operating context

Queue date
2021-04-15
Proposed COD
2029-03-26
IA status
In Progress (unknown study)
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SIENNA SOLAR 2 — verified asset snapshot

FieldValue
Queue IDCAISO-2097
LocationSan Bernardino, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionCalcite Substation 230 kV
Queue date2021-04-15
Proposed COD2029-03-26
IA statusIn Progress (unknown study)