Query
Sicklerville Landfill
Type
Entity Briefing
Entity
Sicklerville Landfill
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Sicklerville Landfill

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Sicklerville Landfill is a 2 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.

Sicklerville Landfill is reported in New Jersey since 2025 under NJR Clean Energy Ventures Corporation. Available operating and financial measures include $2584/kW reported CapEx.

Location
Gloucester, New Jersey
Technology
Solar Photovoltaic
Owner / parent
NJR Clean Energy Ventures Corporation
Operator
NJR Clean Energy Ventures Corporation
Grid
PJM Interconnection
Plant ID
67557

What stands out

1

Sicklerville Landfill is a 2 MW Solar Photovoltaic asset in New Jersey with status Operating.

2

Available financial measures include $2584/kW CapEx.

3

1 linked queue projects represent 2 MW of proposed capacity.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#239 of 356
National rank
#6405 of 7,971

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Sicklerville Landfill — verified asset snapshot

FieldValue
LocationGloucester, New Jersey
TechnologySolar Photovoltaic
Owner / parentNJR Clean Energy Ventures Corporation
OperatorNJR Clean Energy Ventures Corporation
GridPJM Interconnection
Plant ID67557
ISO / marketPJM Interconnection
Balancing authorityPJM Interconnection, LLC