Briefing on Shoshana Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
221 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-05-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Shoshana Storage is a 221 MW Battery project in Texas, currently active.

Shoshana Storage Project LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-30.

Queue ID
ERCOT-23INR0466
Location
Matagorda, Texas
Technology
Battery
Developer
Shoshana Storage Project LLC
Market / region
ERCOT
Point of interconnection
Tap STP – Refuge ckt 27

What stands out

1

Shoshana Storage is a 221 MW Battery project in Texas with status active.

2

Shoshana Storage Project LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-05-30.

Market and operating context

Queue date
2022-03-30
Proposed COD
2028-05-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Shoshana Storage — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0466
LocationMatagorda, Texas
TechnologyBattery
DeveloperShoshana Storage Project LLC
Market / regionERCOT
Point of interconnectionTap STP – Refuge ckt 27
Queue date2022-03-30
Proposed COD2028-05-30