Briefing/projectactive
Shaula III Solar is a 205 MW Solar+Battery project in Texas, currently active.
Shaula Energy Project III, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2025-12-24.
- Queue ID
- ERCOT-23INR0009
- Location
- Dewitt, Texas
- Technology
- Solar+Battery
- Developer
- Shaula Energy Project III, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1
What stands out
1
Shaula III Solar is a 205 MW Solar+Battery project in Texas with status active.
2
Shaula Energy Project III, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2025-12-24.
Market and operating context
- Queue date
- 2019-12-18
- Proposed COD
- 2025-12-24
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.