Query
Shaula III Solar
Type
Entity Briefing
Entity
Shaula III Solar
Generated
2026-10-06T19:21:24.647Z

Briefing on Shaula III Solar

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
205 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2025-12-24
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Shaula III Solar is a 205 MW Solar+Battery project in Texas, currently active.

Shaula Energy Project III, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2025-12-24.

Queue ID
ERCOT-23INR0009
Location
Dewitt, Texas
Technology
Solar+Battery
Developer
Shaula Energy Project III, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1

What stands out

1

Shaula III Solar is a 205 MW Solar+Battery project in Texas with status active.

2

Shaula Energy Project III, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2025-12-24.

Market and operating context

Queue date
2019-12-18
Proposed COD
2025-12-24
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Shaula III Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0009
LocationDewitt, Texas
TechnologySolar+Battery
DeveloperShaula Energy Project III, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1
Queue date2019-12-18
Proposed COD2025-12-24