Briefing/projectactive
Shaula I BESS is a 206 MW Solar+Battery project in Texas, currently active.
Shaula Energy Project LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2025-12-31.
- Queue ID
- ERCOT-24INR0555
- Location
- Dewitt, Texas
- Technology
- Solar+Battery
- Developer
- Shaula Energy Project LLC
- Market / region
- ERCOT
- Point of interconnection
- 5380 Shaula 345kV
What stands out
1
Shaula I BESS is a 206 MW Solar+Battery project in Texas with status active.
2
Shaula Energy Project LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2025-12-31.
Market and operating context
- Queue date
- 2023-07-10
- Proposed COD
- 2025-12-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.