Shasta College PH2 Solar Project is a 2 MW Batteries asset in CAISO (California), currently Operating.
Shasta College PH2 Solar Project is reported in California since 2026 under TotalEnergies Distributed Generation, LLC. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $1544/kW reported CapEx.
- Location
- Shasta, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- TotalEnergies Distributed Generation, LLC
- Operator
- TotalEnergies Distributed Generation, LLC
- Grid
- CAISO (California)
- Plant ID
- 65940
What stands out
Shasta College PH2 Solar Project is a 2 MW Batteries asset in California with status Operating.
Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.
Available financial measures include $1544/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #612 of 992
- National rank
- #6026 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.