Query
Shannon Wind Repower
Type
Entity Briefing
Entity
Shannon Wind Repower
Technology
wind
Generated
2026-10-19T15:09:15.821Z

Briefing on Shannon Wind Repower

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
19 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2027-09-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Shannon Wind Repower is a 19 MW Wind project in Texas, currently active.

Shannon Wind, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-15.

Queue ID
ERCOT-25INR0583
Location
Archer, Texas
Technology
Wind
Developer
Shannon Wind, LLC
Market / region
ERCOT
Point of interconnection
1458 Cobb Switching Station 345 kV

What stands out

1

Shannon Wind Repower is a 19 MW Wind project in Texas with status active.

2

Shannon Wind, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-09-15.

Market and operating context

Queue date
2024-02-27
Proposed COD
2027-09-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Shannon Wind Repower — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0583
LocationArcher, Texas
TechnologyWind
DeveloperShannon Wind, LLC
Market / regionERCOT
Point of interconnection1458 Cobb Switching Station 345 kV
Queue date2024-02-27
Proposed COD2027-09-15