Query
Shadow Ranch Solar
Type
Entity Briefing
Entity
Shadow Ranch Solar
Generated
2026-10-19T16:19:18.947Z

Briefing on Shadow Ranch Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
808 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-06-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Shadow Ranch Solar is a 808 MW Solar project in Texas, currently active.

LectricWind LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-06-01.

Queue ID
ERCOT-25INR0207
Location
Upton, Texas
Technology
Solar
Developer
LectricWind LLC
Market / region
ERCOT
Point of interconnection
842 King Mountain 345kV

What stands out

1

Shadow Ranch Solar is a 808 MW Solar project in Texas with status active.

2

LectricWind LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-06-01.

4

Latest linked story: “Under a Texas sun, agrivoltaics offer farmers a new way to make money” (The Spokesman-Review, 2024-09-24).

Market and operating context

Queue date
2022-09-27
Proposed COD
2026-06-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Shadow Ranch Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0207
LocationUpton, Texas
TechnologySolar
DeveloperLectricWind LLC
Market / regionERCOT
Point of interconnection842 King Mountain 345kV
Queue date2022-09-27
Proposed COD2026-06-01