Query
SGT Hoskins Solar Project Hybrid
Type
Entity Briefing
Entity
SGT Hoskins Solar Project Hybrid
Technology
solar
Generated
2026-10-18T11:00:09.484Z

Briefing on SGT Hoskins Solar Project Hybrid

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
306 MW
Capacity
Planned
Current status
2
Generators
Briefing/plantPlanned

SGT Hoskins Solar Project Hybrid is a 306 MW Batteries asset in ERCOT (Texas), currently Planned.

SGT Hoskins Solar Project Hybrid is reported in Texas under SGT Hoskins Solar Project, LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Lamar, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
SGT Hoskins Solar Project, LLC
Operator
SGT Hoskins Solar Project, LLC
Grid
ERCOT (Texas)
Plant ID
67341

What stands out

1

SGT Hoskins Solar Project Hybrid is a 306 MW Batteries asset in Texas with status Planned.

2

Available financial measures include $1361/kW CapEx.

3

1 linked queue projects represent 204 MW of proposed capacity.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#59 of 378
National rank
#130 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

SGT Hoskins Solar Project Hybrid — verified asset snapshot

FieldValue
LocationLamar, Texas
TechnologyBatteries, Solar Photovoltaic
Owner / parentSGT Hoskins Solar Project, LLC
OperatorSGT Hoskins Solar Project, LLC
GridERCOT (Texas)
Plant ID67341
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.