Seven Angels Energy Storage I is a 514 MW Battery project in Texas, currently active.
Seven Angels Infrastructure LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.
- Queue ID
- ERCOT-28INR0472
- Location
- Hill, Texas
- Technology
- Battery
- Developer
- Seven Angels Infrastructure LLC
- Market / region
- ERCOT
- Point of interconnection
- 68090 Sam Switch Bus 345kV
What stands out
1
Seven Angels Energy Storage I is a 514 MW Battery project in Texas with status active.
2
Seven Angels Infrastructure LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-12-31.
Market and operating context
- Queue date
- 2025-11-05
- Proposed COD
- 2028-12-31
- IA status
- Facility Study
- Study phase
- Facility Study