SERENGETI SOLAR
Type
Entity Briefing
Entity
SERENGETI SOLAR
Generated
2026-10-20T02:24:18.344Z

Briefing on SERENGETI SOLAR

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
76 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-04-20
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

SERENGETI SOLAR is a 76 MW Solar project in Texas, currently active.

Abei Energy Green XIV LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-20.

Queue ID
ERCOT-25INR0227
Location
Delta, Texas
Technology
Solar
Developer
Abei Energy Green XIV LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV Enloe Tap (bus# 11806) – Delta sub (bus# 1802)

What stands out

1

SERENGETI SOLAR is a 76 MW Solar project in Texas with status active.

2

Abei Energy Green XIV LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-20.

Market and operating context

Queue date
2022-12-07
Proposed COD
2028-04-20
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SERENGETI SOLAR — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0227
LocationDelta, Texas
TechnologySolar
DeveloperAbei Energy Green XIV LLC
Market / regionERCOT
Point of interconnectionTap 138kV Enloe Tap (bus# 11806) – Delta sub (bus# 1802)
Queue date2022-12-07
Proposed COD2028-04-20