Briefing/plantOperating
Sequoia 1 is a 401 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.
Sequoia 1 is reported in Texas since 2025 under Sequoia 1 Solar Project. Available operating and financial measures include $1543/kW reported CapEx.
- Location
- Eastland, Texas
- Technology
- Solar Photovoltaic
- Owner / parent
- Sequoia 1 Solar Project
- Operator
- Sequoia 1 Solar Project
- Grid
- ERCOT (Texas)
- Plant ID
- 68200
What stands out
1
Sequoia 1 is a 401 MW Solar Photovoltaic asset in Texas with status Operating.
2
Available financial measures include $1543/kW CapEx.
3
Latest linked story: “Texas is ground zero for a robot revolution in solar panel installations” (Dallas News, 2025-05-01).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #36 of 378
- National rank
- #78 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.