Query
Sequoia 1
Type
Entity Briefing
Entity
Sequoia 1
Generated
2026-10-18T02:44:11.929Z

Briefing on Sequoia 1

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
401 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Sequoia 1 is a 401 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

Sequoia 1 is reported in Texas since 2025 under Sequoia 1 Solar Project. Available operating and financial measures include $1543/kW reported CapEx.

Location
Eastland, Texas
Technology
Solar Photovoltaic
Owner / parent
Sequoia 1 Solar Project
Operator
Sequoia 1 Solar Project
Grid
ERCOT (Texas)
Plant ID
68200

What stands out

1

Sequoia 1 is a 401 MW Solar Photovoltaic asset in Texas with status Operating.

2

Available financial measures include $1543/kW CapEx.

3

Latest linked story: “Texas is ground zero for a robot revolution in solar panel installations” (Dallas News, 2025-05-01).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#36 of 378
National rank
#78 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Sequoia 1 — verified asset snapshot

FieldValue
LocationEastland, Texas
TechnologySolar Photovoltaic
Owner / parentSequoia 1 Solar Project
OperatorSequoia 1 Solar Project
GridERCOT (Texas)
Plant ID68200
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.