Query
Sepik BESS
Type
Entity Briefing
Entity
Sepik BESS
State
TN
Technology
battery
Generated
2026-10-19T22:05:22.305Z

Briefing on Sepik BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
205 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-03-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Sepik BESS is a 205 MW Battery project in Texas, currently active.

BRP Sepik BESS LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-03-01.

Queue ID
ERCOT-23INR0143
Location
Mitchell, Texas
Technology
Battery
Developer
BRP Sepik BESS LLC
Market / region
ERCOT
Point of interconnection
tap 138kV 11342 Loraine South – 10050 Ranger Camp

What stands out

1

Sepik BESS is a 205 MW Battery project in Texas with status active.

2

BRP Sepik BESS LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-03-01.

Market and operating context

Queue date
2020-12-22
Proposed COD
2028-03-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sepik BESS — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0143
LocationMitchell, Texas
TechnologyBattery
DeveloperBRP Sepik BESS LLC
Market / regionERCOT
Point of interconnectiontap 138kV 11342 Loraine South – 10050 Ranger Camp
Queue date2020-12-22
Proposed COD2028-03-01