Second Division Solar is a 130 MW Batteries asset in ERCOT (Texas), currently Operating.
Second Division Solar is reported in Texas since 2024 under Lightsource Renewable Energy Asset Management, LLC. Available operating and financial measures include 16.7% capacity factor and 191 GWh annual generation.
- Location
- Brazoria, Texas
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Lightsource Renewable Energy Asset Management, LLC
- Operator
- Lightsource Renewable Energy Asset Management, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 65981
What stands out
Second Division Solar is a 130 MW Batteries asset in Texas with status Operating.
Latest annual operating measures report 16.7% capacity factor and 191 GWh annual generation.
1 linked queue projects represent 100 MW of proposed capacity.
Latest linked story: “288MW Texas solar portfolio powers up” (Lightsource bp, 2025-01-31).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #225 of 378
- National rank
- #675 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.