Query
SE Edinburg BESS
Type
Entity Briefing
Entity
SE Edinburg BESS
State
TN
Technology
battery
Generated
2026-10-05T06:22:54.068Z

Briefing on SE Edinburg BESS

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
10 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

SE Edinburg BESS is a 10 MW Batteries asset in ERCOT (Texas), currently Under construction.

SE Edinburg BESS is reported in Texas under Marubeni Power International, Inc.. Available operating and financial measures include $1361/kW reported CapEx.

Location
Hidalgo, Texas
Technology
Batteries
Owner / parent
Marubeni Power International, Inc.
Operator
Marubeni Power International, Inc.
Grid
ERCOT (Texas)
Plant ID
69512

What stands out

1

SE Edinburg BESS is a 10 MW Batteries asset in Texas with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

1 linked queue projects represent 10 MW of proposed capacity.

Market and operating context

ISO / market
ERCOT (Texas)
State rank
#316 of 344
National rank
#746 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

SE Edinburg BESS — verified asset snapshot

FieldValue
LocationHidalgo, Texas
TechnologyBatteries
Owner / parentMarubeni Power International, Inc.
OperatorMarubeni Power International, Inc.
GridERCOT (Texas)
Plant ID69512
ISO / marketERCOT (Texas)
State rank#316 of 344