Query
SCV Water - Gladbach Water Treatment Plant Phases I and II
Type
Entity Briefing
Entity
SCV Water - Gladbach Water Treatment Plant Phases I and II
ISO/RTO
isone
Generated
2026-10-13T04:58:22.929Z

Briefing on SCV Water - Gladbach Water Treatment Plant Phases I and II

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
5 MW
Capacity
Operating
Current status
2014
Operating since
1
Generators
12.8%
Capacity factor
5 GWh
Annual generation
Briefing/plantOperating

SCV Water - Gladbach Water Treatment Plant Phases I and II is a 5 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

SCV Water - Gladbach Water Treatment Plant Phases I and II is reported in California since 2014 under SCV Water. Available operating and financial measures include 12.8% capacity factor and 5 GWh annual generation; $12.7/MWh reported energy value.

Location
Los Angeles, California
Technology
Solar Photovoltaic
Owner / parent
SCV Water
Operator
SCV Water
Grid
CAISO (California)
Plant ID
63385

What stands out

1

SCV Water - Gladbach Water Treatment Plant Phases I and II is a 5 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 12.8% capacity factor and 5 GWh annual generation.

3

Available financial measures include $12.7/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#402 of 992
National rank
#3830 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.