Query
Scurry County Wind II
Type
Entity Briefing
Entity
Scurry County Wind II
Technology
wind
Generated
2026-10-17T13:59:56.643Z

Briefing on Scurry County Wind II

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
120 MW
Capacity
Operating
Current status
2007
Operating since
1
Generators
15.7%
Capacity factor
165 GWh
Annual generation
Briefing/plantOperating

Scurry County Wind II is a 120 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.

Scurry County Wind II is reported in Texas since 2007 under Invenergy. Available operating and financial measures include 15.7% capacity factor and 165 GWh annual generation; $1895/kW reported CapEx.

Location
Scurry, Texas
Technology
Onshore Wind Turbine
Owner / parent
Invenergy
Operator
Invenergy Services LLC
Grid
ERCOT (Texas)
Plant ID
56775

What stands out

1

Scurry County Wind II is a 120 MW Onshore Wind Turbine asset in Texas with status Operating.

2

Latest annual operating measures report 15.7% capacity factor and 165 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

4

Latest linked story: “Trump erases another $765 million in offshore wind leases” (Orange County Register, 2026-06-20).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#196 of 252
National rank
#626 of 1,442

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.