Scarlet II Hybrid is a 350 MW Batteries asset in CAISO (California), currently Operating.
Scarlet II Hybrid is reported in California since 2024 under EDPR Scarlet II LLC. Available operating and financial measures include 12.5% capacity factor and 385 GWh annual generation.
- Location
- Fresno, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- EDPR Scarlet II LLC
- Operator
- EDPR Scarlet II LLC
- Grid
- CAISO (California)
- Plant ID
- 66951
What stands out
Scarlet II Hybrid is a 350 MW Batteries asset in California with status Operating.
Latest annual operating measures report 12.5% capacity factor and 385 GWh annual generation.
Latest linked story: “EDP Renewables to Sell 80% Stake in 384 MW Solar and Storage Portfolio” (Mercom Capital Group, 2026-07-31).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #22 of 992
- National rank
- #106 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.