Query
Scarlet II Hybrid
Type
Entity Briefing
Entity
Scarlet II Hybrid
Generated
2026-10-18T13:38:21.902Z

Briefing on Scarlet II Hybrid

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
350 MW
Capacity
Operating
Current status
2024
Operating since
2
Generators
12.5%
Capacity factor
385 GWh
Annual generation
Briefing/plantOperating

Scarlet II Hybrid is a 350 MW Batteries asset in CAISO (California), currently Operating.

Scarlet II Hybrid is reported in California since 2024 under EDPR Scarlet II LLC. Available operating and financial measures include 12.5% capacity factor and 385 GWh annual generation.

Location
Fresno, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
EDPR Scarlet II LLC
Operator
EDPR Scarlet II LLC
Grid
CAISO (California)
Plant ID
66951

What stands out

1

Scarlet II Hybrid is a 350 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 12.5% capacity factor and 385 GWh annual generation.

3

Latest linked story: “EDP Renewables to Sell 80% Stake in 384 MW Solar and Storage Portfolio” (Mercom Capital Group, 2026-07-31).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#22 of 992
National rank
#106 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.