Query
Sayle Storage SLF
Type
Entity Briefing
Entity
Sayle Storage SLF
Generated
2026-10-17T10:12:14.986Z

Briefing on Sayle Storage SLF

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
122 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-05-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Sayle Storage SLF is a 122 MW Solar+Battery project in Texas, currently active.

Sayle Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-31.

Queue ID
ERCOT-27INR0260
Location
Jackson, Texas
Technology
Solar+Battery
Developer
Sayle Storage LLC
Market / region
ERCOT
Point of interconnection
Tap 69kV #5522 Edna - #5518 El Toro SW

What stands out

1

Sayle Storage SLF is a 122 MW Solar+Battery project in Texas with status active.

2

Sayle Storage LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-05-31.

4

Latest linked story: “US DOE closes US$26.5 billion loan package to utility Southern Company for 16GW of capacity, including BESS” (Energy-Storage.News, 2026-03-09).

Market and operating context

Queue date
2024-06-03
Proposed COD
2027-05-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sayle Storage SLF — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0260
LocationJackson, Texas
TechnologySolar+Battery
DeveloperSayle Storage LLC
Market / regionERCOT
Point of interconnectionTap 69kV #5522 Edna - #5518 El Toro SW
Queue date2024-06-03
Proposed COD2027-05-31