Briefing on SANDSTORM WIND POWER

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Wind+Battery
Technology
CAISO
Market / region
2030-02-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

SANDSTORM WIND POWER is a 150 MW Wind+Battery project in California, currently active.

The reported queue phase is IA Executed. Proposed COD is 2030-02-01.

Queue ID
CAISO-138
Location
Riverside, California
Technology
Wind+Battery
Market / region
CAISO
Point of interconnection
Devers Substation 220 kV

What stands out

1

SANDSTORM WIND POWER is a 150 MW Wind+Battery project in California with status active.

2

The reported queue phase is IA Executed; proposed COD is 2030-02-01.

Market and operating context

Queue date
2006-10-23
Proposed COD
2030-02-01
IA status
IA Executed
Study phase
IA Executed
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SANDSTORM WIND POWER — verified asset snapshot

FieldValue
Queue IDCAISO-138
LocationRiverside, California
TechnologyWind+Battery
Market / regionCAISO
Point of interconnectionDevers Substation 220 kV
Queue date2006-10-23
Proposed COD2030-02-01
IA statusIA Executed