Query
Sandford Solar and Storage
Type
Entity Briefing
Entity
Sandford Solar and Storage
ISO/RTO
isone
Generated
2026-10-17T08:56:59.353Z

Briefing on Sandford Solar and Storage

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
227 MW
Capacity
Planned
Current status
2
Generators
Briefing/plantPlanned

Sandford Solar and Storage is a 227 MW Batteries asset in ERCOT (Texas), currently Planned.

Sandford Solar and Storage is reported in Texas under Belltown Power Texas 2, LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Wise, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Belltown Power Texas 2, LLC
Operator
Belltown Power Texas 2, LLC
Grid
ERCOT (Texas)
Plant ID
68173

What stands out

1

Sandford Solar and Storage is a 227 MW Batteries asset in Texas with status Planned.

2

Available financial measures include $1361/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#123 of 378
National rank
#303 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Sandford Solar and Storage — verified asset snapshot

FieldValue
LocationWise, Texas
TechnologyBatteries, Solar Photovoltaic
Owner / parentBelltown Power Texas 2, LLC
OperatorBelltown Power Texas 2, LLC
GridERCOT (Texas)
Plant ID68173
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.