Query
Sandford Solar
Type
Entity Briefing
Entity
Sandford Solar
Generated
2026-10-19T10:04:03.299Z

Briefing on Sandford Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
126 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-08-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Sandford Solar is a 126 MW Solar+Battery project in Texas, currently active.

BT Sandford Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-08-15.

Queue ID
ERCOT-26INR0318
Location
Wise, Texas
Technology
Solar+Battery
Developer
BT Sandford Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429)

What stands out

1

Sandford Solar is a 126 MW Solar+Battery project in Texas with status active.

2

BT Sandford Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-08-15.

Market and operating context

Queue date
2024-01-03
Proposed COD
2028-08-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Sandford Solar — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0318
LocationWise, Texas
TechnologySolar+Battery
DeveloperBT Sandford Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429)
Queue date2024-01-03
Proposed COD2028-08-15