Briefing on SANBORN SOLAR 2

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
707 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2025-10-01
Proposed COD
C11
Queue phase
Briefing/projectactive

SANBORN SOLAR 2 is a 707 MW Solar+Battery project in California, currently active.

The reported queue phase is C11. Proposed COD is 2025-10-01.

Queue ID
CAISO-1518
Location
Kern, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Windhub Substation 230kV

What stands out

1

SANBORN SOLAR 2 is a 707 MW Solar+Battery project in California with status active.

2

The reported queue phase is C11; proposed COD is 2025-10-01.

3

Latest linked story: “Strata puts 70MW/280MWh California BESS project into commercial operation” (Energy-Storage.News, 2024-12-05).

Market and operating context

Queue date
2018-04-16
Proposed COD
2025-10-01
IA status
IA Executed
Study phase
C11
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SANBORN SOLAR 2 — verified asset snapshot

FieldValue
Queue IDCAISO-1518
LocationKern, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionWindhub Substation 230kV
Queue date2018-04-16
Proposed COD2025-10-01
IA statusIA Executed