Briefing/plantUnder construction
Sanborn Hybrid 3 is a 578 MW Batteries asset in CAISO (California), currently Under construction.
Sanborn Hybrid 3 is reported in California under Terra-Gen Operating Co-Hybrid. The briefing retains the exact identity and market fields available in the current asset record.
- Location
- Kern, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Terra-Gen Operating Co-Hybrid
- Operator
- Terra-Gen Operating Co-Hybrid
- Grid
- CAISO (California)
- Plant ID
- 69956
What stands out
1
Sanborn Hybrid 3 is a 578 MW Batteries asset in California with status Under construction.
2
1 linked queue projects represent 560 MW of proposed capacity.
Market and operating context
- ISO / market
- CAISO (California)
- State rank
- #7 of 992
- National rank
- #28 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.