San Jacinto County Peaking Facility is a 170 MW Natural Gas Fired Combustion Turbine asset in MISO (Midcontinent), currently Operating.
San Jacinto County Peaking Facility is reported in Texas since 2001 under East Texas Electric Coop, Inc. Available operating and financial measures include 9.3% capacity factor and 140 GWh annual generation; $965/kW reported CapEx.
- Location
- San Jacinto, Texas
- Technology
- Natural Gas Fired Combustion Turbine
- Owner / parent
- East Texas Electric Coop, Inc
- Operator
- East Texas Electric Coop, Inc
- Grid
- MISO (Midcontinent)
- Plant ID
- 56603
What stands out
San Jacinto County Peaking Facility is a 170 MW Natural Gas Fired Combustion Turbine asset in Texas with status Operating.
Latest annual operating measures report 9.3% capacity factor and 140 GWh annual generation.
Available financial measures include $965/kW CapEx.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- SERC
- State rank
- #132 of 325
- National rank
- #819 of 2,025
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.