Briefing on San Jacinto County Peaking Facility

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
170 MW
Capacity
Operating
Current status
2001
Operating since
2
Generators
9.3%
Capacity factor
140 GWh
Annual generation
Briefing/plantOperating

San Jacinto County Peaking Facility is a 170 MW Natural Gas Fired Combustion Turbine asset in MISO (Midcontinent), currently Operating.

San Jacinto County Peaking Facility is reported in Texas since 2001 under East Texas Electric Coop, Inc. Available operating and financial measures include 9.3% capacity factor and 140 GWh annual generation; $965/kW reported CapEx.

Location
San Jacinto, Texas
Technology
Natural Gas Fired Combustion Turbine
Owner / parent
East Texas Electric Coop, Inc
Operator
East Texas Electric Coop, Inc
Grid
MISO (Midcontinent)
Plant ID
56603

What stands out

1

San Jacinto County Peaking Facility is a 170 MW Natural Gas Fired Combustion Turbine asset in Texas with status Operating.

2

Latest annual operating measures report 9.3% capacity factor and 140 GWh annual generation.

3

Available financial measures include $965/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
State rank
#132 of 325
National rank
#819 of 2,025

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.