Query
San Gabriel Hydro Project
Type
Entity Briefing
Entity
San Gabriel Hydro Project
Technology
hydro
Generated
2026-10-18T01:55:34.017Z

Briefing on San Gabriel Hydro Project

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
5 MW
Capacity
Operating
Current status
1987
Operating since
2
Generators
11.1%
Capacity factor
5 GWh
Annual generation
Briefing/plantOperating

San Gabriel Hydro Project is a 5 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.

San Gabriel Hydro Project is reported in California since 1987 under Los Angeles County-San Gabriel. Available operating and financial measures include 11.1% capacity factor and 5 GWh annual generation; $2294/kW reported CapEx.

Location
Los Angeles, California
Technology
Conventional Hydroelectric
Owner / parent
Los Angeles County-San Gabriel
Operator
Los Angeles County-San Gabriel
Grid
CAISO (California)
Plant ID
54017

What stands out

1

San Gabriel Hydro Project is a 5 MW Conventional Hydroelectric asset in California with status Operating.

2

Latest annual operating measures report 11.1% capacity factor and 5 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#162 of 247
National rank
#886 of 1,462

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.