Query
San Diego International Airport BESS
Type
Entity Briefing
Entity
San Diego International Airport BESS
State
TN
Technology
battery
Generated
2026-10-18T01:05:04.241Z

Briefing on San Diego International Airport BESS

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2021
Operating since
1
Generators
-0.0%
Capacity factor
-0 GWh
Annual generation
Briefing/plantOperating

San Diego International Airport BESS is a 2 MW Batteries asset in CAISO (California), currently Operating.

San Diego International Airport BESS is reported in California since 2021 under Critical Loop, Inc.. Available operating and financial measures include -0.0% capacity factor and -0 GWh annual generation; $1796/kW reported CapEx.

Location
San Diego, California
Technology
Batteries
Owner / parent
Critical Loop, Inc.
Operator
Critical Loop, Inc.
Grid
CAISO (California)
Plant ID
62754

What stands out

1

San Diego International Airport BESS is a 2 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report -0.0% capacity factor and -0 GWh annual generation.

3

Available financial measures include $1796/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#183 of 202
National rank
#947 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.