Saluga Ranch Storage is a 125 MW Battery project in Texas, currently active.
Saluga Ranch Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-08-25.
- Queue ID
- ERCOT-26INR0356
- Location
- Dimmit, Texas
- Technology
- Battery
- Developer
- Saluga Ranch Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- Asherton 8283 - Big wells 8613 -138 kV
What stands out
1
Saluga Ranch Storage is a 125 MW Battery project in Texas with status active.
2
Saluga Ranch Energy, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-08-25.
Market and operating context
- Queue date
- 2024-02-02
- Proposed COD
- 2027-08-25
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.