Query
Saluga Ranch Storage
Type
Entity Briefing
Entity
Saluga Ranch Storage
Generated
2026-10-19T06:12:22.314Z

Briefing on Saluga Ranch Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
125 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-08-25
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Saluga Ranch Storage is a 125 MW Battery project in Texas, currently active.

Saluga Ranch Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-08-25.

Queue ID
ERCOT-26INR0356
Location
Dimmit, Texas
Technology
Battery
Developer
Saluga Ranch Energy, LLC
Market / region
ERCOT
Point of interconnection
Asherton 8283 - Big wells 8613 -138 kV

What stands out

1

Saluga Ranch Storage is a 125 MW Battery project in Texas with status active.

2

Saluga Ranch Energy, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-08-25.

Market and operating context

Queue date
2024-02-02
Proposed COD
2027-08-25
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Saluga Ranch Storage — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0356
LocationDimmit, Texas
TechnologyBattery
DeveloperSaluga Ranch Energy, LLC
Market / regionERCOT
Point of interconnectionAsherton 8283 - Big wells 8613 -138 kV
Queue date2024-02-02
Proposed COD2027-08-25