Salt-Lick Storage is a 155 MW Solar+Battery project in Texas, currently active.
Salt-Lick Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-01.
- Queue ID
- ERCOT-28INR0134
- Location
- Culberson, Texas
- Technology
- Solar+Battery
- Developer
- Salt-Lick Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- 11198 Elcor_8 138 KV
What stands out
Salt-Lick Storage is a 155 MW Solar+Battery project in Texas with status active.
Salt-Lick Storage, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-06-01.
Latest linked story: “SRP and EDP Renewables Announce New Energy Storage System to Support Increasing Energy Demand” (SRP Newsroom, 2024-11-18).
Market and operating context
- Queue date
- 2024-10-10
- Proposed COD
- 2028-06-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.