Briefing on Salt City Solar Project - Hybrid

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
62 MW
Capacity
Operating
Current status
2023
Operating since
2
Generators
18.9%
Capacity factor
104 GWh
Annual generation
Briefing/plantOperating

Salt City Solar Project - Hybrid is a 62 MW Batteries asset in PJM Interconnection, currently Operating.

Salt City Solar Project - Hybrid is reported in Ohio since 2023 under ENGIE. Available operating and financial measures include 18.9% capacity factor and 104 GWh annual generation; $33.2/MWh reported energy value.

Location
Ross, Ohio
Technology
Batteries, Solar Photovoltaic
Owner / parent
ENGIE
Operator
Salt City Solar LLC
Grid
PJM Interconnection
Plant ID
65302

What stands out

1

Salt City Solar Project - Hybrid is a 62 MW Batteries asset in Ohio with status Operating.

2

Latest annual operating measures report 18.9% capacity factor and 104 GWh annual generation.

3

Available financial measures include $33.2/MWh energy value.

4

Latest linked story: “Engie’s Billion-Dollar Tax Equity Financing” (Brazil Energy Insight, 2024-03-04).

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#40 of 92
National rank
#1310 of 7,971

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.