Rush Creek is a 13 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.
Rush Creek is reported in California since 1916 under Edison International. Available operating and financial measures include 37.4% capacity factor and 43 GWh annual generation; $1671/kW reported CapEx.
- Location
- Mono, California
- Technology
- Conventional Hydroelectric
- Owner / parent
- Edison International
- Operator
- Southern California Edison Co
- Grid
- CAISO (California)
- Plant ID
- 357
What stands out
Rush Creek is a 13 MW Conventional Hydroelectric asset in California with status Operating.
Latest annual operating measures report 37.4% capacity factor and 43 GWh annual generation.
Available financial measures include $33.0/MWh OpEx, $1671/kW CapEx.
Latest linked story: “Making the Electric Grid More Resilient to Extreme Weather” (Energized by Edison, 2021-11-02).
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #106 of 247
- National rank
- #578 of 1,462
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.