Running Iron Solar is a 205 MW Solar project in Texas, currently active.
Running Iron Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-16.
- Queue ID
- ERCOT-26INR0258
- Location
- Matagorda, Texas
- Technology
- Solar
- Developer
- Running Iron Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV Conoco 8138 - Black Cat 80124
What stands out
1
Running Iron Solar is a 205 MW Solar project in Texas with status active.
2
Running Iron Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-10-16.
Market and operating context
- Queue date
- 2023-10-25
- Proposed COD
- 2028-10-16
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.