Query
ROUGH HAT 2 queue pipeline — 1 projects by technology and status
Type
Entity Briefing
Entity
ROUGH HAT 2
ISO/RTO
isone
Generated
2026-10-14T04:49:42.534Z

Briefing on ROUGH HAT 2

Entity Briefing
Generated Oct 14, 2026·Dataset freshness not reported
408 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2027-12-01
Proposed COD
C13
Queue phase
Briefing/projectactive

ROUGH HAT 2 is a 408 MW Solar+Battery project in Nevada, currently active.

The reported queue phase is C13. Proposed COD is 2027-12-01.

Queue ID
CAISO-1799
Location
Clark, Nevada
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Trout Canyon Substation 230 kV

What stands out

1

ROUGH HAT 2 is a 408 MW Solar+Battery project in Nevada with status active.

2

The reported queue phase is C13; proposed COD is 2027-12-01.

3

Latest linked story: “US power line approvals unlock giant solar, storage” (Reuters, 2024-10-31).

Market and operating context

Queue date
2020-04-15
Proposed COD
2027-12-01
IA status
IA Executed
Study phase
C13
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

ROUGH HAT 2 — verified asset snapshot

FieldValue
Queue IDCAISO-1799
LocationClark, Nevada
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionTrout Canyon Substation 230 kV
Queue date2020-04-15
Proposed COD2027-12-01
IA statusIA Executed