Query
Roseland Solar
Type
Entity Briefing
Entity
Roseland Solar
Generated
2026-10-19T15:35:39.091Z

Briefing on Roseland Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
254 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2025-11-29
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Roseland Solar is a 254 MW Solar project in Texas, currently active.

Hecate Energy is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-11-29.

Queue ID
ERCOT-20INR0205
Location
Falls, Texas
Technology
Solar
Developer
Hecate Energy
Market / region
ERCOT
Point of interconnection
tap 345kV 3390 Jewett - 3399 Ratsnake

What stands out

1

Roseland Solar is a 254 MW Solar project in Texas with status active.

2

Hecate Energy is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2025-11-29.

4

Latest linked story: “Enel Green Power pairs renewable energy with storage, adding grid resiliency in Texas” (Enel Green Power, 2021-12-21).

Market and operating context

Queue date
2018-11-30
Proposed COD
2025-11-29
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Roseland Solar — verified asset snapshot

FieldValue
Queue IDERCOT-20INR0205
LocationFalls, Texas
TechnologySolar
DeveloperHecate Energy
Market / regionERCOT
Point of interconnectiontap 345kV 3390 Jewett - 3399 Ratsnake
Queue date2018-11-30
Proposed COD2025-11-29