Query
Rolling Thunder Wind Farm Hybrid
Type
Entity Briefing
Entity
Rolling Thunder Wind Farm Hybrid
Technology
wind
Generated
2026-10-09T01:55:14.066Z

Briefing on Rolling Thunder Wind Farm Hybrid

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
26 MW
Capacity
Operating
Current status
2009
Operating since
2
Generators
34.1%
Capacity factor
77 GWh
Annual generation
Briefing/plantOperating

Rolling Thunder Wind Farm Hybrid is a 26 MW Batteries asset in SPP (Southwest Power Pool), currently Operating.

Rolling Thunder Wind Farm Hybrid is reported in South Dakota since 2009 under Clearlight Energy Holdings LP. Available operating and financial measures include 34.1% capacity factor and 77 GWh annual generation; $1895/kW reported CapEx.

Location
Hand, South Dakota
Technology
Batteries, Onshore Wind Turbine
Owner / parent
Clearlight Energy Holdings LP
Operator
Clearlight Energy Holdings LP
Grid
SPP (Southwest Power Pool)
Plant ID
57045

What stands out

1

Rolling Thunder Wind Farm Hybrid is a 26 MW Batteries asset in South Dakota with status Operating.

2

Latest annual operating measures report 34.1% capacity factor and 77 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

Market and operating context

ISO / market
SPP (Southwest Power Pool)
Balancing authority
Southwest Power Pool
NERC region
MRO
State rank
#22 of 25
National rank
#1058 of 1,442

Why it matters

For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.