Rolling Thunder Wind Farm Hybrid is a 26 MW Batteries asset in SPP (Southwest Power Pool), currently Operating.
Rolling Thunder Wind Farm Hybrid is reported in South Dakota since 2009 under Clearlight Energy Holdings LP. Available operating and financial measures include 34.1% capacity factor and 77 GWh annual generation; $1895/kW reported CapEx.
- Location
- Hand, South Dakota
- Technology
- Batteries, Onshore Wind Turbine
- Owner / parent
- Clearlight Energy Holdings LP
- Operator
- Clearlight Energy Holdings LP
- Grid
- SPP (Southwest Power Pool)
- Plant ID
- 57045
What stands out
Rolling Thunder Wind Farm Hybrid is a 26 MW Batteries asset in South Dakota with status Operating.
Latest annual operating measures report 34.1% capacity factor and 77 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Market and operating context
- ISO / market
- SPP (Southwest Power Pool)
- Balancing authority
- Southwest Power Pool
- NERC region
- MRO
- State rank
- #22 of 25
- National rank
- #1058 of 1,442
Why it matters
For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.