Briefing/projectactive
Rogers Draw BESS is a 149 MW Battery project in Texas, currently active.
ROGERS DRAW ENERGY STORAGE, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-06-30.
- Queue ID
- ERCOT-24INR0514
- Location
- Gillespie, Texas
- Technology
- Battery
- Developer
- ROGERS DRAW ENERGY STORAGE, LLC
- Market / region
- ERCOT
- Point of interconnection
- 7751 Headwaters substation 138kV
What stands out
1
Rogers Draw BESS is a 149 MW Battery project in Texas with status active.
2
ROGERS DRAW ENERGY STORAGE, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-06-30.
Market and operating context
- Queue date
- 2023-01-03
- Proposed COD
- 2026-06-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.