Rocky Point BESS is a 5 MW Batteries asset in North Carolina, currently Operating.
Rocky Point BESS is reported in North Carolina since 2024 under North Carolina El Member Corp. Available operating and financial measures include -0.5% capacity factor and -0 GWh annual generation; $1361/kW reported CapEx.
- Location
- Pender, North Carolina
- Technology
- Batteries
- Owner / parent
- North Carolina El Member Corp
- Operator
- North Carolina El Member Corp
- Grid
- Duke Energy Progress East
- Plant ID
- 65245
What stands out
1
Rocky Point BESS is a 5 MW Batteries asset in North Carolina with status Operating.
2
Latest annual operating measures report -0.5% capacity factor and -0 GWh annual generation.
3
Available financial measures include $1361/kW CapEx.
Market and operating context
- Balancing authority
- Duke Energy Progress East
- NERC region
- SERC
- State rank
- #25 of 44
- National rank
- #816 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.