Rockpile Storage is a 104 MW Battery project in Texas, currently active.
Rockpile Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-12.
- Queue ID
- ERCOT-29INR0109
- Location
- Frio, Texas
- Technology
- Battery
- Developer
- Rockpile Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- Direct to substation at 69kV Derby BUS ID #5842
What stands out
1
Rockpile Storage is a 104 MW Battery project in Texas with status active.
2
Rockpile Storage, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-06-12.
Market and operating context
- Queue date
- 2025-04-21
- Proposed COD
- 2029-06-12
- IA status
- Facility Study
- Study phase
- Facility Study