Query
Rock N' Roll Solar SLF
Type
Entity Briefing
Entity
Rock N' Roll Solar SLF
Generated
2026-10-19T15:18:27.848Z

Briefing on Rock N' Roll Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
152 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-08-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Rock N' Roll Solar SLF is a 152 MW Solar+Battery project in Texas, currently active.

Rock N’ Roll Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-08-30.

Queue ID
ERCOT-24INR0041
Location
Brazoria, Texas
Technology
Solar+Battery
Developer
Rock N’ Roll Solar, LLC
Market / region
ERCOT
Point of interconnection
tap 138kV 44600 Rosharon - 44531 Winmil

What stands out

1

Rock N' Roll Solar SLF is a 152 MW Solar+Battery project in Texas with status active.

2

Rock N’ Roll Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-08-30.

Market and operating context

Queue date
2021-05-10
Proposed COD
2027-08-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Rock N' Roll Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0041
LocationBrazoria, Texas
TechnologySolar+Battery
DeveloperRock N’ Roll Solar, LLC
Market / regionERCOT
Point of interconnectiontap 138kV 44600 Rosharon - 44531 Winmil
Queue date2021-05-10
Proposed COD2027-08-30