Briefing/plantOut of service
Rochester 2 is a 9 MW Conventional Hydroelectric asset in NYISO (New York), currently Out of service.
Rochester 2 is reported in New York since 1960 under Avangrid. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $2314/kW reported CapEx.
- Location
- Monroe, New York
- Technology
- Conventional Hydroelectric
- Owner / parent
- Avangrid
- Operator
- Rochester Gas & Electric Corp
- Grid
- NYISO (New York)
- Plant ID
- 2639
What stands out
1
Rochester 2 is a 9 MW Conventional Hydroelectric asset in New York with status Out of service.
2
Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.
3
Available financial measures include $2314/kW CapEx.
Market and operating context
- ISO / market
- NYISO (New York)
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
- State rank
- #48 of 165
- National rank
- #704 of 1,462
Why it matters
For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.