Roadrunner Solar and BESS is a 470 MW Batteries asset in Arizona, currently Operating.
Roadrunner Solar and BESS is reported in Arizona since 2025 under Clenera LLC. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Cochise, Arizona
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Clenera LLC
- Operator
- Clenera LLC
- Grid
- Western Area Power Administration - Desert Southwest Region
- Plant ID
- 67823
What stands out
Roadrunner Solar and BESS is a 470 MW Batteries asset in Arizona with status Operating.
Available financial measures include $1361/kW CapEx.
Latest linked story: “EDF, Enlight advance solar-plus-storage projects in Southwestern US” (Energy-Storage.News, 2025-10-03).
Market and operating context
- Balancing authority
- Western Area Power Administration - Desert Southwest Region
- NERC region
- WECC
- State rank
- #15 of 61
- National rank
- #53 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.