Briefing on Roadrunner Reserve Phase 2

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
200 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Roadrunner Reserve Phase 2 is a 200 MW Batteries asset in Arizona, currently Under construction.

Roadrunner Reserve Phase 2 is reported in Arizona under Fortis. Available operating and financial measures include $1361/kW reported CapEx.

Location
Pima, Arizona
Technology
Batteries
Owner / parent
Fortis
Operator
Tucson Electric Power Co
Grid
Tucson Electric Power Company
Plant ID
68937

What stands out

1

Roadrunner Reserve Phase 2 is a 200 MW Batteries asset in Arizona with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “Reserve power for Tucson” (Arizona Daily Star, 2025-11-06).

Market and operating context

Balancing authority
Tucson Electric Power Company
NERC region
WECC
State rank
#28 of 61
National rank
#157 of 994

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Roadrunner Reserve Phase 2 — verified asset snapshot

FieldValue
LocationPima, Arizona
TechnologyBatteries
Owner / parentFortis
OperatorTucson Electric Power Co
GridTucson Electric Power Company
Plant ID68937
Balancing authorityTucson Electric Power Company
NERC regionWECC