Query
Roadrunner Reserve Phase 1
Type
Entity Briefing
Entity
Roadrunner Reserve Phase 1
Generated
2026-10-18T23:54:34.041Z

Briefing on Roadrunner Reserve Phase 1

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
200 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
-2.4%
Capacity factor
-21 GWh
Annual generation
Briefing/plantOperating

Roadrunner Reserve Phase 1 is a 200 MW Batteries asset in Arizona, currently Operating.

Roadrunner Reserve Phase 1 is reported in Arizona since 2025 under Fortis. Available operating and financial measures include -2.4% capacity factor and -21 GWh annual generation; $1361/kW reported CapEx.

Location
Pima, Arizona
Technology
Batteries
Owner / parent
Fortis
Operator
Tucson Electric Power Co
Grid
Tucson Electric Power Company
Plant ID
67905

What stands out

1

Roadrunner Reserve Phase 1 is a 200 MW Batteries asset in Arizona with status Operating.

2

Latest annual operating measures report -2.4% capacity factor and -21 GWh annual generation.

3

Available financial measures include $1361/kW CapEx.

4

Latest linked story: “Reserve power for Tucson” (Arizona Daily Star, 2025-11-06).

Market and operating context

Balancing authority
Tucson Electric Power Company
NERC region
WECC
State rank
#33 of 61
National rank
#187 of 994

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.