Roadrunner Reserve Phase 1 is a 200 MW Batteries asset in Arizona, currently Operating.
Roadrunner Reserve Phase 1 is reported in Arizona since 2025 under Fortis. Available operating and financial measures include -2.4% capacity factor and -21 GWh annual generation; $1361/kW reported CapEx.
- Location
- Pima, Arizona
- Technology
- Batteries
- Owner / parent
- Fortis
- Operator
- Tucson Electric Power Co
- Grid
- Tucson Electric Power Company
- Plant ID
- 67905
What stands out
Roadrunner Reserve Phase 1 is a 200 MW Batteries asset in Arizona with status Operating.
Latest annual operating measures report -2.4% capacity factor and -21 GWh annual generation.
Available financial measures include $1361/kW CapEx.
Latest linked story: “Reserve power for Tucson” (Arizona Daily Star, 2025-11-06).
Market and operating context
- Balancing authority
- Tucson Electric Power Company
- NERC region
- WECC
- State rank
- #33 of 61
- National rank
- #187 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.