Query
Riverside Holyoke
Type
Entity Briefing
Entity
Riverside Holyoke
Generated
2026-10-10T13:32:24.650Z

Briefing on Riverside Holyoke

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
7 MW
Capacity
Operating
Current status
1906
Operating since
4
Generators
63.4%
Capacity factor
38 GWh
Annual generation
Briefing/plantOperating

Riverside Holyoke is a 7 MW Conventional Hydroelectric asset in ISO New England, currently Operating.

Riverside Holyoke is reported in Massachusetts since 1906 under City of Holyoke Gas and Elec Dept - (MA). Available operating and financial measures include 63.4% capacity factor and 38 GWh annual generation; $2294/kW reported CapEx.

Location
Hampden, Massachusetts
Technology
Conventional Hydroelectric
Owner / parent
City of Holyoke Gas and Elec Dept - (MA)
Operator
City of Holyoke Gas and Elec Dept - (MA)
Grid
ISO New England
Plant ID
1607

What stands out

1

Riverside Holyoke is a 7 MW Conventional Hydroelectric asset in Massachusetts with status Operating.

2

Latest annual operating measures report 63.4% capacity factor and 38 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#11 of 32
National rank
#774 of 1,462

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.