Query
Riverside Holyoke
Type
Entity Briefing
Entity
Riverside Holyoke
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Riverside Holyoke

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

7 MW
Capacity
Operating
Current status
1906
Operating since
4
Generators
63.4%
Capacity factor
38 GWh
Annual generation
Briefing/plantOperating

Riverside Holyoke is a 7 MW Conventional Hydroelectric asset in ISO New England, currently Operating.

Riverside Holyoke is reported in Massachusetts since 1906 under City of Holyoke Gas and Elec Dept - (MA). Available operating and financial measures include 63.4% capacity factor and 38 GWh annual generation; $2294/kW reported CapEx.

Location
Hampden, Massachusetts
Technology
Conventional Hydroelectric
Owner / parent
City of Holyoke Gas and Elec Dept - (MA)
Operator
City of Holyoke Gas and Elec Dept - (MA)
Grid
ISO New England
Plant ID
1607

What stands out

1

Riverside Holyoke is a 7 MW Conventional Hydroelectric asset in Massachusetts with status Operating.

2

Latest annual operating measures report 63.4% capacity factor and 38 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#11 of 32
National rank
#774 of 1,462

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.