Briefing on River Boat Solar

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
502 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-09-25
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

River Boat Solar is a 502 MW Solar+Battery project in Texas, currently active.

Champion Creek Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-25.

Queue ID
ERCOT-28INR0132
Location
Mitchell, Texas
Technology
Solar+Battery
Developer
Champion Creek Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 10053 Cattlemen 5 - 76030 Gasconades Creek

What stands out

1

River Boat Solar is a 502 MW Solar+Battery project in Texas with status active.

2

Champion Creek Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-25.

Market and operating context

Queue date
2024-09-04
Proposed COD
2028-09-25
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

River Boat Solar — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0132
LocationMitchell, Texas
TechnologySolar+Battery
DeveloperChampion Creek Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 10053 Cattlemen 5 - 76030 Gasconades Creek
Queue date2024-09-04
Proposed COD2028-09-25