Briefing/projectactive
Rio Star Energy Storage is a 144 MW Battery project in Texas, currently active.
Rio Star Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-20.
- Queue ID
- ERCOT-28INR0221
- Location
- Wichita, Texas
- Technology
- Battery
- Developer
- Rio Star Energy Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 1464 Wichita Falls South Switch – 1474 Scotland 138 kV
What stands out
1
Rio Star Energy Storage is a 144 MW Battery project in Texas with status active.
2
Rio Star Energy Storage, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-04-20.
Market and operating context
- Queue date
- 2025-02-14
- Proposed COD
- 2029-04-20
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.