Briefing on Rio Star Energy Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
144 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-04-20
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Rio Star Energy Storage is a 144 MW Battery project in Texas, currently active.

Rio Star Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-20.

Queue ID
ERCOT-28INR0221
Location
Wichita, Texas
Technology
Battery
Developer
Rio Star Energy Storage, LLC
Market / region
ERCOT
Point of interconnection
Tap 1464 Wichita Falls South Switch – 1474 Scotland 138 kV

What stands out

1

Rio Star Energy Storage is a 144 MW Battery project in Texas with status active.

2

Rio Star Energy Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-04-20.

Market and operating context

Queue date
2025-02-14
Proposed COD
2029-04-20
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Rio Star Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0221
LocationWichita, Texas
TechnologyBattery
DeveloperRio Star Energy Storage, LLC
Market / regionERCOT
Point of interconnectionTap 1464 Wichita Falls South Switch – 1474 Scotland 138 kV
Queue date2025-02-14
Proposed COD2029-04-20