Query
RIO BRAVO SOLAR 2
Type
Entity Briefing
Entity
RIO BRAVO SOLAR 2
Technology
solar
Generated
2026-10-06T19:51:08.547Z

Briefing on RIO BRAVO SOLAR 2

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
40 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2027-07-30
Proposed COD
C06
Queue phase
Briefing/projectactive

RIO BRAVO SOLAR 2 is a 40 MW Solar+Battery project in California, currently active.

The reported queue phase is C06. Proposed COD is 2027-07-30.

Queue ID
CAISO-972
Location
Kern, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Midway-Temblor 115kV line

What stands out

1

RIO BRAVO SOLAR 2 is a 40 MW Solar+Battery project in California with status active.

2

The reported queue phase is C06; proposed COD is 2027-07-30.

Market and operating context

Queue date
2013-04-30
Proposed COD
2027-07-30
IA status
IA Executed
Study phase
C06
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

RIO BRAVO SOLAR 2 — verified asset snapshot

FieldValue
Queue IDCAISO-972
LocationKern, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionMidway-Temblor 115kV line
Queue date2013-04-30
Proposed COD2027-07-30
IA statusIA Executed