Rio Bravo Hydro Project is a 14 MW Conventional Hydroelectric asset in CAISO (California), currently Standby.
Rio Bravo Hydro Project is reported in California since 1989 under Olcese Water District. Available operating and financial measures include 23.5% capacity factor and 29 GWh annual generation; $2294/kW reported CapEx.
- Location
- Kern, California
- Technology
- Conventional Hydroelectric
- Owner / parent
- Olcese Water District
- Operator
- Olcese Water District
- Grid
- CAISO (California)
- Plant ID
- 50037
What stands out
Rio Bravo Hydro Project is a 14 MW Conventional Hydroelectric asset in California with status Standby.
Latest annual operating measures report 23.5% capacity factor and 29 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #102 of 247
- National rank
- #567 of 1,462
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.