Query
Ringe
Type
Entity Briefing
Entity
Ringe
Generated
2026-10-17T10:59:01.121Z

Briefing on Ringe

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
3 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Ringe is a 3 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Under construction.

Ringe is reported in Minnesota under CLP Holdings. The briefing retains the exact identity and market fields available in the current asset record.

Location
Olmsted, Minnesota
Technology
Solar Photovoltaic
Owner / parent
CLP Holdings
Operator
OneEnergy, Inc.
Grid
MISO (Midcontinent)
Plant ID
69938

What stands out

1

Ringe is a 3 MW Solar Photovoltaic asset in Minnesota with status Under construction.

Market and operating context

ISO / market
MISO (Midcontinent)
State rank
#161 of 549
National rank
#4907 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Ringe — verified asset snapshot

FieldValue
LocationOlmsted, Minnesota
TechnologySolar Photovoltaic
Owner / parentCLP Holdings
OperatorOneEnergy, Inc.
GridMISO (Midcontinent)
Plant ID69938
ISO / marketMISO (Midcontinent)
State rank#161 of 549