Briefing/plantPlanned
Rexford 2 Solar Farm is a 400 MW Batteries asset in CAISO (California), currently Planned.
Rexford 2 Solar Farm is reported in California under 22SV 8ME LLC. Available operating and financial measures include $1544/kW reported CapEx.
- Location
- Tulare, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- 22SV 8ME LLC
- Operator
- 22SV 8ME LLC
- Grid
- CAISO (California)
- Plant ID
- 68485
What stands out
1
Rexford 2 Solar Farm is a 400 MW Batteries asset in California with status Planned.
2
Available financial measures include $1544/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #10 of 202
- National rank
- #73 of 994
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.